Description:

The Oracle Application Implementation Methodology (AIM) is a proven approach for implementation of Oracle Applications across business domains. … According to Oracle “AIM provides the tools needed to effectively and efficiently plan, conduct, and control project steps to successfully implement new business systems.”

1. Business Process Architecture (BP) 2. Business Requirements Definition (RD) 3. Business Requirements Mapping 4. Application and Technical Architecture (TA)
BP.010 Define Business and Process Strategy

BP.020 Catalog and Analyze Potential Changes

BP.030 Determine Data Gathering Requirements

BP.040 Develop Current Process Model

BP.050 Review Leading Practices

BP.060 Develop High-Level Process Vision

BP.070 Develop High-Level Process Design

BP.080 Develop Future Process Model

BP.090 Document Business Procedure

RD.010 Identify Current Financial and Operating Structure

RD.020 Conduct Current Business Baseline

RD.030 Establish Process and Mapping Summary

RD.040 Gather Business Volumes and Metrics

RD.050 Gather Business Requirements

RD.060 Determine Audit and Control Requirements

RD.070 Identify Business Availability Requirements

RD.080 Identify Reporting and Information Access Requirements

BR.010 Analyze High-Level Gaps

BR.020 Prepare mapping environment

BR.030 Map Business requirements

BR.040 Map Business Data

BR.050 Conduct Integration Fit Analysis

BR.060 Create Information Model

BR.070 Create Reporting Fit Analysis

BR.080 Test Business Solutions

BR.090 Confirm Integrated Business Solutions

BR.100 Define Applications Setup

BR.110 Define security Profiles

TA.010 Define Architecture Requirements and Strategy

TA.020 Identify Current Technical Architecture

TA.030 Develop Preliminary Conceptual Architecture

TA.040 Define Application Architecture

TA.050 Define System Availability Strategy

TA.060 Define Reporting and Information Access Strategy

TA.070 Revise Conceptual Architecture

TA.080 Define Application Security Architecture

TA.090 Define Application and Database Server Archtecture

TA.100 Define and Propose Architecture Subsystems

TA.110 Define System Capacity Plan

TA.120 Define Platform and Network Architecture

TA.130 Define Application Deployment Plan

TA.140 Assess Performance Risks

TA.150 Define System Management Procedures

5. Module Design and Build (MD) 6. Data Conversion (CV) 7. Documentation (DO) 8. Business System Testing (TE)
MD.010 Define Application Extension Strategy

MD.020 Define and estimate application extensions

MD.030 Define design standards

MD.040 Define Build Standards

MD.050 Create Application extensions functional design

MD.060 Design Database extensions

MD.070 Create Application extensions technical design

MD.080 Review functional and Technical designs

MD.090 Prepare Development environment

MD.100 Create Database extensions

MD.110 Create Application extension modules

MD.120 Create Installation routines

CV.010 Define data conversion requirements and strategy

CV.020 Define Conversion standards

CV.030 Prepare conversion environment

CV.040 Perform conversion data mapping

CV.050 Define manual conversion procedures

CV.060 Design conversion programs

CV.070 Prepare conversion test plans

CV.080 Develop conversion programs

CV.090 Perform conversion unit tests

CV.100 Perform conversion business objects

CV.110 Perform conversion validation tests

CV.120 Install conversion programs

CV.130 Convert and verify data

DO.010 Define documentation requirements and strategy

DO.020 Define Documentation standards and procedures

DO.030 Prepare glossary

DO.040 Prepare documentation environment

DO.050 Produce documentation prototypes and templates

DO.060 Publish user reference manual

DO.070 Publish user guide

DO.080 Publish technical reference manual

DO.090 Publish system management guide

TE.010 Define testing requirements and strategy

TE.020 Develop unit test script

TE.030 Develop link test script

TE.040 Develop system test script

TE.050 Develop systems integration test script

TE.060 Prepare testing environments

TE.070 Perform unit test

TE.080 Perform link test

TE.090 perform installation test

TE.100 Prepare key users for testing

TE.110 Perform system test

TE.120 Perform systems integration test

TE.130 Perform Acceptance test

 

Summary:

The AIM is delivered in the form of a software bundle that packages the various document templates, which have been identified as deliverables under the AIM approach.

queries?

Do drop a note by writing us at contact@doyensys.com or use the comment section below to ask your questions.

 

 

Recent Posts

Start typing and press Enter to search