Description:
The Oracle Application Implementation Methodology (AIM) is a proven approach for implementation of Oracle Applications across business domains. … According to Oracle “AIM provides the tools needed to effectively and efficiently plan, conduct, and control project steps to successfully implement new business systems.”
1. Business Process Architecture (BP) | 2. Business Requirements Definition (RD) | 3. Business Requirements Mapping | 4. Application and Technical Architecture (TA) |
BP.010 Define Business and Process Strategy
BP.020 Catalog and Analyze Potential Changes BP.030 Determine Data Gathering Requirements BP.040 Develop Current Process Model BP.050 Review Leading Practices BP.060 Develop High-Level Process Vision BP.070 Develop High-Level Process Design BP.080 Develop Future Process Model BP.090 Document Business Procedure |
RD.010 Identify Current Financial and Operating Structure
RD.020 Conduct Current Business Baseline RD.030 Establish Process and Mapping Summary RD.040 Gather Business Volumes and Metrics RD.050 Gather Business Requirements RD.060 Determine Audit and Control Requirements RD.070 Identify Business Availability Requirements RD.080 Identify Reporting and Information Access Requirements |
BR.010 Analyze High-Level Gaps
BR.020 Prepare mapping environment BR.030 Map Business requirements BR.040 Map Business Data BR.050 Conduct Integration Fit Analysis BR.060 Create Information Model BR.070 Create Reporting Fit Analysis BR.080 Test Business Solutions BR.090 Confirm Integrated Business Solutions BR.100 Define Applications Setup BR.110 Define security Profiles |
TA.010 Define Architecture Requirements and Strategy
TA.020 Identify Current Technical Architecture TA.030 Develop Preliminary Conceptual Architecture TA.040 Define Application Architecture TA.050 Define System Availability Strategy TA.060 Define Reporting and Information Access Strategy TA.070 Revise Conceptual Architecture TA.080 Define Application Security Architecture TA.090 Define Application and Database Server Archtecture TA.100 Define and Propose Architecture Subsystems TA.110 Define System Capacity Plan TA.120 Define Platform and Network Architecture TA.130 Define Application Deployment Plan TA.140 Assess Performance Risks TA.150 Define System Management Procedures |
5. Module Design and Build (MD) | 6. Data Conversion (CV) | 7. Documentation (DO) | 8. Business System Testing (TE) |
MD.010 Define Application Extension Strategy
MD.020 Define and estimate application extensions MD.030 Define design standards MD.040 Define Build Standards MD.050 Create Application extensions functional design MD.060 Design Database extensions MD.070 Create Application extensions technical design MD.080 Review functional and Technical designs MD.090 Prepare Development environment MD.100 Create Database extensions MD.110 Create Application extension modules MD.120 Create Installation routines |
CV.010 Define data conversion requirements and strategy
CV.020 Define Conversion standards CV.030 Prepare conversion environment CV.040 Perform conversion data mapping CV.050 Define manual conversion procedures CV.060 Design conversion programs CV.070 Prepare conversion test plans CV.080 Develop conversion programs CV.090 Perform conversion unit tests CV.100 Perform conversion business objects CV.110 Perform conversion validation tests CV.120 Install conversion programs CV.130 Convert and verify data |
DO.010 Define documentation requirements and strategy
DO.020 Define Documentation standards and procedures DO.030 Prepare glossary DO.040 Prepare documentation environment DO.050 Produce documentation prototypes and templates DO.060 Publish user reference manual DO.070 Publish user guide DO.080 Publish technical reference manual DO.090 Publish system management guide |
TE.010 Define testing requirements and strategy
TE.020 Develop unit test script TE.030 Develop link test script TE.040 Develop system test script TE.050 Develop systems integration test script TE.060 Prepare testing environments TE.070 Perform unit test TE.080 Perform link test TE.090 perform installation test TE.100 Prepare key users for testing TE.110 Perform system test TE.120 Perform systems integration test TE.130 Perform Acceptance test |
Summary:
The AIM is delivered in the form of a software bundle that packages the various document templates, which have been identified as deliverables under the AIM approach.
queries?
Do drop a note by writing us at contact@doyensys.com or use the comment section below to ask your questions.